Analysis of restricted earth fault relay application within a shunt capacitor bank design impacting on protection stability
- Authors: Minkley, Warick
- Date: 2013
- Subjects: Electric power systems -- Protection , Electric power transmission -- Equipment and supplies -- Protection
- Language: English
- Type: Thesis , Masters , MTech
- Identifier: vital:9604 , http://hdl.handle.net/10948/d1021106
- Description: This research is aimed at analyzing the performance of the restricted earth fault relay used on a 400kV capacitor bank scheme used on the Eskom Transmission network. After the commissioning of two Capacitor Banks using the above mentioned scheme design the plant was energized. As a result of the energization the Shunt Capacitor Bank (SCB) then experienced spurious trips. The cause of the trips was found to be the operation of the restricted earth fault relay. In this research project, restricted earth fault protection on SCBs in the Eskom Transmission environment will be the area of interest. The proposed research will analyze the current SCB protection scheme in service specifically looking at the restricted earth fault circuit design and relay performance. An equivalent model of the SCB from primary plant perspective based on theory will be derived. Recording and analyzing of Comtrade transient waveforms respectively, when the bank is nergized, will be done in order to provide a reference base to work from. Manual alculations of various parameters from the derived model including transient inrush currents and fault currents will be performed to access applicable scheme parameters. Further calculations will include the voltage setting for the restricted earth fault relay. As a result of the analysis a recommendation will be made on a viable solution or a revised design will be put forward, based on the results, to improve the scheme’s performance. The protection scheme is used on the two 400kV 100MVAR capacitor banks 11 and 12 at Hydra Substation.
- Full Text:
- Date Issued: 2013
- Authors: Minkley, Warick
- Date: 2013
- Subjects: Electric power systems -- Protection , Electric power transmission -- Equipment and supplies -- Protection
- Language: English
- Type: Thesis , Masters , MTech
- Identifier: vital:9604 , http://hdl.handle.net/10948/d1021106
- Description: This research is aimed at analyzing the performance of the restricted earth fault relay used on a 400kV capacitor bank scheme used on the Eskom Transmission network. After the commissioning of two Capacitor Banks using the above mentioned scheme design the plant was energized. As a result of the energization the Shunt Capacitor Bank (SCB) then experienced spurious trips. The cause of the trips was found to be the operation of the restricted earth fault relay. In this research project, restricted earth fault protection on SCBs in the Eskom Transmission environment will be the area of interest. The proposed research will analyze the current SCB protection scheme in service specifically looking at the restricted earth fault circuit design and relay performance. An equivalent model of the SCB from primary plant perspective based on theory will be derived. Recording and analyzing of Comtrade transient waveforms respectively, when the bank is nergized, will be done in order to provide a reference base to work from. Manual alculations of various parameters from the derived model including transient inrush currents and fault currents will be performed to access applicable scheme parameters. Further calculations will include the voltage setting for the restricted earth fault relay. As a result of the analysis a recommendation will be made on a viable solution or a revised design will be put forward, based on the results, to improve the scheme’s performance. The protection scheme is used on the two 400kV 100MVAR capacitor banks 11 and 12 at Hydra Substation.
- Full Text:
- Date Issued: 2013
Replacement of seven 132/66 kv distance protection schemes by means of a generic relay implemented as a strategic spare
- Authors: Harris, Raymond Trevor
- Date: 2000
- Subjects: Protective relays , Electric power systems -- Protection
- Language: English
- Type: Thesis , Masters , MTech
- Identifier: vital:10808 , http://hdl.handle.net/10948/34 , Protective relays , Electric power systems -- Protection
- Description: Eskom is experiencing problems in the field of protection maintenance and in-service breakdowns which negatively influence the quality of electrical supply to the consumer, an integral component of the utility business. These facts initiated the research into the further development of a generic relay to be implemented as a strategic spare for the replacement of several schemes operating within Eskom’s southern region. These include the electromechanical, solid state and numerical distance protection relay and scheme failures on the 132 / 66 kV feeder network. Hence, the primary objective of the research is to develop, test and configure the strategic spare in terms of software and peripheral hardware for the input and output terminal connections, generic equations and settings for the purpose of the scheme replacements. The various schemes are assessed for stepped distance and permissive intertripping for three or single pole operation. This is done in conjunction with the internal and external circuit diagrams in order to understand the detailed operation of the scheme and to ensure the effective implementation of the strategic spare. The generic relay is configured for the emergency replacement of the various schemes during in-service breakdowns. This constitutes a temporary installation and therefore the downtime in essence, of all the distance protection schemes that require replacement, is limited to a minimum. This dissertation therefore explores the implementation of the strategic spare.
- Full Text:
- Date Issued: 2000
- Authors: Harris, Raymond Trevor
- Date: 2000
- Subjects: Protective relays , Electric power systems -- Protection
- Language: English
- Type: Thesis , Masters , MTech
- Identifier: vital:10808 , http://hdl.handle.net/10948/34 , Protective relays , Electric power systems -- Protection
- Description: Eskom is experiencing problems in the field of protection maintenance and in-service breakdowns which negatively influence the quality of electrical supply to the consumer, an integral component of the utility business. These facts initiated the research into the further development of a generic relay to be implemented as a strategic spare for the replacement of several schemes operating within Eskom’s southern region. These include the electromechanical, solid state and numerical distance protection relay and scheme failures on the 132 / 66 kV feeder network. Hence, the primary objective of the research is to develop, test and configure the strategic spare in terms of software and peripheral hardware for the input and output terminal connections, generic equations and settings for the purpose of the scheme replacements. The various schemes are assessed for stepped distance and permissive intertripping for three or single pole operation. This is done in conjunction with the internal and external circuit diagrams in order to understand the detailed operation of the scheme and to ensure the effective implementation of the strategic spare. The generic relay is configured for the emergency replacement of the various schemes during in-service breakdowns. This constitutes a temporary installation and therefore the downtime in essence, of all the distance protection schemes that require replacement, is limited to a minimum. This dissertation therefore explores the implementation of the strategic spare.
- Full Text:
- Date Issued: 2000
- «
- ‹
- 1
- ›
- »